The post-construction clean is the last stage of a renovation and the one you notice most. Use this list to check the work before signing it off.
Before starting
- All trades have finished
- Rubble and leftover materials have been removed
- The property has power and water
- You’ve agreed whether there are one or two passes
Room by room
- Ceilings, walls and sockets dust-free
- Frames, tracks and shutters clean
- Glass free of paint and labels
- Inside cupboards and drawers vacuumed
- Sanitaryware and taps free of cement or silicone
- Floors scrubbed and, if needed, treated
Common mistakes
Booking the clean too early, using acidic products on natural stone or not vacuuming ventilation ducts. A specialist company avoids all of these.
Request detailed proposals
Give the size, type of renovation and handover date. If there are several units, say so: some partner companies work with developers.
Frequently asked questions
How long does a post-construction clean take?
An average flat can be done in one or two days by a team of two or three.
Do I need a company for it?
It is highly recommended: fine dust needs industrial vacuums and specialist products.