1. Home
  2. Blog
  3. Post-construction cleaning checklist for Andorra

Post-construction cleaning checklist for Andorra

Everything to check in an after-build clean before handover or moving in.

Post-constructionSuper Neteja08/11/20265 min read
Post-construction cleaning checklist for Andorra

The post-construction clean is the last stage of a renovation and the one you notice most. Use this list to check the work before signing it off.

Before starting

  • All trades have finished
  • Rubble and leftover materials have been removed
  • The property has power and water
  • You’ve agreed whether there are one or two passes

Room by room

  • Ceilings, walls and sockets dust-free
  • Frames, tracks and shutters clean
  • Glass free of paint and labels
  • Inside cupboards and drawers vacuumed
  • Sanitaryware and taps free of cement or silicone
  • Floors scrubbed and, if needed, treated

Common mistakes

Booking the clean too early, using acidic products on natural stone or not vacuuming ventilation ducts. A specialist company avoids all of these.

Request detailed proposals

Give the size, type of renovation and handover date. If there are several units, say so: some partner companies work with developers.

Frequently asked questions

How long does a post-construction clean take?

An average flat can be done in one or two days by a team of two or three.

Do I need a company for it?

It is highly recommended: fine dust needs industrial vacuums and specialist products.

Proposal request

Shall we get you proposals?

Tell us what needs cleaning in one minute. Our partner companies covering your parish will contact you with their proposal.

  • Free, no obligation
  • Companies contact you directly
  • You hire whoever you choose

Prefer to write? info@superneteja.com

Proposal request

Free, no obligation

Request sent!

Our partner companies covering your area will contact you shortly. Please also check your spam folder.

Get free proposals →